Dedication of Mount Wachusett Wind Turbines

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
237 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 28, 2011

In March, MWCC activated its two 1.65 MW Vestas V82 turbines, which are expected to generate 97 percent of the college's annual electricity demand, plus return an additional 30 percent of power back to the grid.

On Wednesday, I was honored to have one of these turbines dedicated in my name alongside Edward R. Terceiro, Jr., MWCC executive vice president emeritus and resident engineer.

For more information on this project and MWCC's efforts to become a zero-net energy campus, please visit www.facebook.com/CongressmanJohnOlver or http://greenongreenstreet.blogspot.com/

Produced by the Office of Congressman John Olver, Natalie Blais, District Director for New Media

  • likes, 0 dislikes

All Comments

Adding comments has been disabled for this video.
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more