(Part 2) FlowTracker Handheld-ADV Training: Field Measurement

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,236
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 21, 2008

(Part 2 of 5 video clips)
Join SonTek Senior Applications Specialist, John Sloat, as he walks you through some of the steps you will need to take before making your first discharge measurement with the FlowTracker Handheld ADV® (Acoustic Doppler Velocimeter). Learn how to conduct FlowTracker pre-deployment tests, how to select a measurement site, best measurement techniques, wading rod use and much more!

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (SonTekYSI)

  • You can always attach the tape from either side of the river you choose.

    In this specific case, it was easier to start the tape on the right bank and go to the left.

    Best Regards,

    John Sloat

see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Why don't you tie the tape from left to right?

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more