Upload

Loading icon Loading...

This video is unavailable.

Robbins EPBs in Action: Xi'an Metro

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like TheRobbinsCo's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike TheRobbinsCo's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add TheRobbinsCo's video to your playlist.

Uploaded on May 3, 2011

Highly variable, water bearing soils and a settlement restriction of only 15 mm have made Xi'an's Metro Line 1 the most complex in the city. Answering the challenge, two Robbins 6.2m EPBs with smooth flow cutterheads have kept abrasive ground under control while achieving the best advance rates on the project.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to