The Scarborough Flyer. 31 July 2009.
Loading...
1,675
Uploader Comments (sarahandmatt13)
see all
All Comments (10)
-
Very smooth videoing once again Matt and a joy to watch. Some nifty leg work to get from the footbridge to the restart at Standedge tunnel. Chris
-
nice one
-
She had slowed a bit at at Mossley from when you had filmed her at Stanedge . She was clagging it too as if she was picking up speed.
-
And, depending on the design of the locos, open cabs!!
-
Thanks mate, 2002 the last Duchess over Standedge. Not sure about the stop, think i prefere em at full tilt !!.........Matt
Loading...
Nice video Matt. I was at Greenfield that day, and you could hear 6233 from Mossley. Made a terrific sound.
Jeff
thunderchild21 2 years ago
Thanks Jeff, could hear her in Greenfield too ! Going like a good un' !! Gutted when she was shut off and became obvious the loop stop was on !!.................Matt
sarahandmatt13 2 years ago
Nice clips Matt, I'll also bet that there was some hurried shutting of windows as they entered the tunnel, good job she was not clagging like some we have seen.
ralph5407 2 years ago 2
Thanks Ralph, imagine back in the 60's she'd have been following a clagging 8F on rubbish coal and if the timing was wrong copped a soaking from the water troughs that were just inside the Diggle end ot the tunnel, hell !!..............Matt
sarahandmatt13 2 years ago
Great selection of shots there Matt, I liked your comment about the crew taking a deep breath before entering Standedge, very apt.
acw71000 2 years ago 3
Thanks Austin, that restart into the tunnel must be awful, far worse back in the day though, when the air would have been full of the previous chaps exhaust !!.....Matt
sarahandmatt13 2 years ago