Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

road construction

Loading...

Sign in or sign up now!
20,018
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 31, 2007

this is what i do allllllllllll day i set ontop my paver and make roads....this job is 3 miles long and we just finished it....

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (pitbullowner77)

  • What's the name of the course to become road builder?

  • @KingMunkHUu i never took a course...got hired on threwa temp service and worked my way up the ladder...

  • Today we did 574 tons of base and 354 tons of binder. Tommorow we are putting down 1,600 tons of top coat.

  • we r doing a runway and there rules are so strict we battled with the inspector till 2 yesterday and he finally let us pave and from 2 pm to 7 pm we had to get half thickness of the base put down we r redoing a 1200 foot long section by120 foot wide hole....it called for 960 tons...we did it in 5 hours .we put the base down 3 and a quarter inches deep next lift we have to run string line...

  • how much ton you do on this job

  • right around 5000....

see all

All Comments (21)

Sign In or Sign Up now to post a comment!
  • mr pitbull, i need to get in contact with you...business

  • weird lookin hopper on the front of that paver 

  • road work machines look scary

  • does that stuff smell

  • shuttle buggy creeping at lowest speed ,not stopping probobly smooth as glass

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more