Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Cuesta College Miracle Worker 2003 set construction

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
52 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 9, 2010

In 2003 the Cuesta College drama department put on a production of The Miracle Worker. I helped work on the set for this and was given this video on a CD after the production had ended by the set designer.

It was a lot of fun and a lot of challenges were overcome during construction.

The water pump & "cement slab" move and pump water.

Category:

Sports

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • One of the most dramatic sets built to date. We didn't even strike it right away if I remember correctly.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more