I tried a few different things on the time lapse today, so if things seem off at any point it's because I was experimenting. Part 2 for today picked up about mid-way into the fuel water separator install and included:
Fuel water separator install
Plumbing mockup
Feed valve install
Tank install for test fit
More plumbing mockups
Install fittings for tank heat exchanger
Pressure test the coiled tank heat exchanger
Put JB Weld onto fittings
Progress was a bit slower than expected today. It took me about the same amount of time as my first Soyburban install (this being my second) even though I knew the gameplan because I spent much more time mocking up the plumbing and trying to make sure the tank heater would be reliable for a very long time.