Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

(pt1) Power and Efficiency Gains by Deploying 415V in N. American Data Centers

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
389 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 10, 2009

Within enterprise data centers, power used for operating the facility, lighting, running IT loads and cooling is the largest operational expense. Numerous papers and articles have been published by The Green Grid, The Uptime Institute, PG&E, Lawrence Berkeley Laboratories and others discussing ways to measure, monitor and increase efficiencies. This paper discusses various approaches to reducing power consumption and to increase end-to-end efficiency in the data center by bringing 415 VAC to the cabinet level. With power densities continuing to rise, more efficient solutions continue to be explored especially as power cost increases and power availability decreases.

The power path from the building entrance to the IT loads contains several power converters and transformers for each conversion; which contribute to inefficiencies and power losses. Reducing the number of transformers and operating at a higher voltage improves efficiency and reduces electrical costs. This paper discusses an alternative approach to power distribution, presently being implemented in North American data centers that increase efficiencies and savings by reducing upfront capital costs, power consumption and floor space.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more