Burj Dubai

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
8,879
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 4, 2010

More at http://www.sfetcu.com

Burj Dubai (Arabic: برج دبي‎ "Dubai Tower") is a supertall skyscraper in Dubai, United Arab Emirates, and is the tallest man-made structure ever built, at 818 m (2,684 ft). Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009 and the building officially opened on 4 January 2010.

The building is part of the 2 km2 (0.8 sq mi) flagship development called Downtown Burj Dubai at the "First Interchange" along Sheikh Zayed Road, near Dubai's main business district. The tower's architect is Adrian Smith, who worked with Skidmore, Owings and Merrill (SOM) until 2006. The Chicago-based architecture and engineering firm SOM was in charge of the project design. The primary builder is a joint venture of South Korean Samsung C&T, who also built the Taipei 101 and Petronas Twin Towers., Besix and Arabtec. Turner Construction Company was chosen as the construction project manager . Under UAE law, the Contractor and the Engineer of Record are jointly and severally liable for the performance of Burj Dubai. Therefore, by adoption of SOMs design and by being appointed as Architect and Engineer of Record, Hyder Consulting is legally the Design Consultant for the tower.

The total budget for the Burj Dubai project is about US $4.1 billion; and for the entire new "Downtown Dubai", US $20 billion. Mohamed Ali Alabbar, the CEO of Emaar Properties, speaking at the Council on Tall Buildings and Urban Habitat 8th World Congress, said that the price of office space at Burj Dubai had reached US $4,000 per sq ft (over US $43,000 per m2) and that the Armani Residences, also in Burj Dubai, were selling for US $3,500 per sq ft (over US $37,500 per m2). (Wikipedia)

Location: Dubai, United Arab Emirates
Groundbreaking: 21 September 2004
Opening: 4 January 2010
Height: Antenna or spire 818 m (2,684 ft)
Floor count: 160 habitable floors
Floor area: 334,000 m2 (3,595,100 sq ft)
Companies involved:
Architect: Skidmore, Owings and Merrill
Structural engineer: Bill Baker at SOM,
Contractor: Joint venture between Samsung C&T, Besix; and Arabtec, Supervision Consultant Engineer & Architect of Record Hyder Consulting, Construction Project Manager Turner Construction, Grocon, Planning Bauer AG and Middle East Foundations, Lift contractor Otis, VT consultant Lerch Bates
Developer: Emaar

  • likes, 2 dislikes

Link to this comment:

Share to:
see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • wait 2 dislike

  • 20 billion in cost

  • 828 m

  • nice

  • Impresionant !

  • Loading comment...
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more