The EPR™ reactor is under construction in three countries (France, Finland and China) and under licensing review in two countries (United States and United Kingdon).
2:20 I was always intrigued by how the EPR design has the RPV brought in after the containment was fully built. Apparently the vessel internals are also installed in modular units after the vessel is put in place.
3:46 These transitions are also head-turning. The so-called "4D" modeling of the entire construction process is something I've heard a lot about and I think the idea is that it will reduce the risk in these new builds.
Impressive! Nice Animations! Great to see Nuclear Power as clean an efficient Energy rising.
kai84m 2 months ago
2:20 I was always intrigued by how the EPR design has the RPV brought in after the containment was fully built. Apparently the vessel internals are also installed in modular units after the vessel is put in place.
3:46 These transitions are also head-turning. The so-called "4D" modeling of the entire construction process is something I've heard a lot about and I think the idea is that it will reduce the risk in these new builds.
zassounotsukushi 2 months ago