See a step-by-step demonstration on how to test a recloser controller using standard Flexitest Switches. Find out how, with this procedure, you can now verify correct voltage phasing, inject currents and voltages, and operate the high voltage unit without disconnecting the 24pin control cable.
For more information, click here: http://www.poweranswercenter.com/51
Link to this comment:
All Comments (0)