Sweat Equity Bi-Level Basement Remodel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,346
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 15, 2009

Travis waited almost a year to get a room at our new house. We started with studs and concrete and created a great teen boys bedroom. I learned a lot along the way and did a lot of things for the first time. It took 20 days to finish. We, moved some electrical boxes, built a wall, framed a doorway, drywalled, mudded, sanded, painted, hung a ceiling fan, trimmed a window and doorway, sealed the concrete, insulated the floor, layed flooring underlayment and carpeting, built some furniture, and hung a door.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Great job! :)

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more