en 5 minutos marca más de 20 palets, considerando 5 minutos más para movimentación = 10 minutos = 120 palets por hora = 960 en 8 horas.
5 minutes = 20 pallets. Considering another 5 minutes to take out and set in the next stack, 10 minutes = 20 pallets. 1 hour = 120 pallets = 960 in 8 hours
Link to this comment:
All Comments (0)