Upload

Loading icon Loading...

This video is unavailable.

Sneak Peek of the New Ottawa Greenbelt Pathway

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like Adam Hunt's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike Adam Hunt's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add Adam Hunt's video to your playlist.

Uploaded on Nov 7, 2010

On 07 November 2010 I rode as much of the Pine Grove Sector Greenbelt pathway as I could on my 1986 Norco Alpine mountain bike, to see how the trail construction is going. As can be seen some of the trail has been gravelled with "stonedust" and some has not yet. It is supposed to be completed by 31 March 2011. Complete explanation in the NCC press release at http://ncc.gc.ca/bins/ncc_web_content...

Our home website is http://web.ncf.ca/adamandruth/

This video was made on the Kino 1.3.4 video editor running on the Puppy Linux 5.1.1 operating system.

  • Category

  • License

    Standard YouTube License

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to