Upload

Loading...

This video is unavailable.

Sneak Peek of the New Ottawa Greenbelt Pathway

Like this video?

Sign in to make your opinion count.

Don't like this video?

Sign in to make your opinion count.

Want to watch this again later?

Sign in to add this video to a playlist.

Uploaded on Nov 7, 2010

On 07 November 2010 I rode as much of the Pine Grove Sector Greenbelt pathway as I could on my 1986 Norco Alpine mountain bike, to see how the trail construction is going. As can be seen some of the trail has been gravelled with "stonedust" and some has not yet. It is supposed to be completed by 31 March 2011. Complete explanation in the NCC press release at http://ncc.gc.ca/bins/ncc_web_content...

Our home website is http://web.ncf.ca/adamandruth/

This video was made on the Kino 1.3.4 video editor running on the Puppy Linux 5.1.1 operating system.

  • Category

  • License

    • Standard YouTube License

Loading...

Loading...

Loading...

Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading...

Loading...
Working...
to add this to Watch Later

Add to