Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

HDD with Fusible C-905® in American Canyon, CA

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,383
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 5, 2009

In May 2007, Underground Solutions, Inc. (UGSI) contracted with Mountain Cascade, Inc. to provide UGSIs Fusible C-905® pipe and fusion services for a new Sanitary Sewer Force Main to be installed in American Canyon, CA. The 2,900 LF of new force main was installed using both horizontal directional drilling (HDD) and direct bury, and was connected to the existing force main on June 13, 2007. The line was in put into operation the same day.

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • buen video del c905

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more