Upload

Loading icon Loading...

This video is unavailable.

John Stebbins on BIM for Contractors

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like digitalvis's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike digitalvis's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add digitalvis's video to your playlist.

Uploaded on Jun 18, 2008

John Stebbins talks about BIM as it relates to contractors.

Topics:
- creating a constructible virtual building for detecting errors and collisions in a design and coordinating with MEP professionals
- 3D detailing for more accurate and predictable building details
- 4D: the element of time and how it can be used for construction sequencing
- 5D: adding the money component for estimating

References:
- NavisWorks - www.navisworks.com
- Solibri - www.solibri.com

Digital Vision - www.digitalvis.com

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to