Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Tube End Forming Process (3 5 Inch Schedule 80 Slip Fit)

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
13,698
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 24, 2009

Ram forming press forms Schedule 80 pipe

Proto-1 Manufacturing recently modified one of its RAM-70 forming presses to accomplish a 9-in.-deep cold expansion on 3.5-in. Schedule 80 pipe. Intended for use in fluid and gas transmission applications or other pipe-over-pipe connections, the machine makes the expansion in less than 5 seconds.

The machine uses a 70 ton hydraulic ram forming cylinder in place of the usual 40 ton cylinder. It also has a standard 70-ton clamp cylinder, laser optic safety sweep, and an optional jib crane for die changeover. Because of the extreme tool pressure involved, the usual six-hit progressive shuttle toolholder was dropped and a simpler single-hit setup was used in its place.

The custom machine was delivered with tooling to perform both 3 ½-in. Schedule 80 and 2 ½-in. Schedule 40 expansions.

PROTO-1 Manufacturing LLC, P.O. Box 399, Winneconne, WI 54986-0399, 920-582-4491, www.proto1mfg.com

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • does this machine can do the same for square pipe

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more