The Crystal Method had to cut their 90 min set down to 40 min for the Leeds Festival and then rework an entirely new set the next day for a 45 min set for the Reading UK Festival. This is The Crystal Method at work before the Reading show as well as their crew who are trying to fix a piece of equipment before show time.
Link to this comment:
All Comments (0)