Upload

Loading icon Loading...

This video is unavailable.

Jumbo Offshore: The Greater Gabbard Project - Transition Piece transportation and installation

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like Jumbo Maritime Heavylift's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike Jumbo Maritime Heavylift's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add Jumbo Maritime Heavylift's video to your playlist.

Uploaded on Nov 5, 2010

Jumbo Offshore used its' DP2 Heavy Lift Vessel Jumbo Javelin to transport and install 131 Transition Pieces for client Fluor at the Greater Gabbard Offshore Windfarm. Jumbo pioneered the transport from the port of Flushing (Netherlands) to the Offshore installation site at the East coast of the UK and installation with a free floating vessel, which makes transit to the worksite and positioning next to the monopile a lot faster then more conventional methods using Jack-up vessels. With a workability for critical lifts in wave heights up to at least Hs = 1.5m*, Jumbo Offshore is now able to deliver various installation services for offshore wind farms.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to