Footage from the Aug. 9 meeting of the La Grange Village Board where residents ask the village manager for a time frame for the informational meeting on flooding the village has told residents it will conduct. The village manager committed to "by October". Other residents asked that their specific streets be included in an engineering study the Board approved. Full story at http://lagrange.patch.com
Link to this comment:
All Comments (0)