Well, I finally got around to doing an onboard video atop my ATSF Extended Vision Caboose's cupola. This shows the temporal alignment of the Phase II Extension. Eventually, all the curves will be converted to 10' diameter and it will traverse in the side yards a lot more as opposed to traversing a significant portion of the driveway. If you notice, I wasn't able to run my A-B-A around due to the 8-foot diameter s-curves at the end of the extension.
Taken by Alex O'Donnell on December 27th, 2011. All content is © copyright 2011 Alex O'Donnell. Unauthorized reproduction will result in reporting.
@Gunsnclapton4 Thanks.
AODProds 1 month ago
nice
Gunsnclapton4 1 month ago
@chappybolo Cool man, just let me know when you can come down and I can see if my schedule allows it. The SCWRR is open all week long until New Year's ;)...
AODProds 2 months ago
@AODProds Cool! I go back to school next monday but definetly on a weekend soon. I would LOVE to run on your meticulous and large railroad. The ruby is not sprung and likes a big flat space like this to run on
Thanks a lot buddy
chappybolo 2 months ago
@chappybolo Whenever you want to come down to run, just let me know. Aside from next Sunday, I'm available until next Wednesday when I go back to school.
AODProds 2 months ago
I wanna come over with my ruby soon
chappybolo 2 months ago