Expo Line systems-integration testing by Metro begins

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
995 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 14, 2011

Expo has now turned over the testing (so far done by the contractor) to Metro and Metro has started running trains normally for the first time. Before this the trains would stop at every crossing and use flagsmen. Soon after this will start the so-called prerevenue operation, where multiple trains will run at regular schedule but without passengers. This is through Buckingham Road, Farmdale Avenue Station, and La Brea Station. Prerevenue operation may start soon and usually lasts for five weeks before the revenue operation begins. But the Expo - Blue junction, Farmdale Station, and Culver City Station may delay the prerevenue operation and opening to later.

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • wow a metro with a "k5la" horn

  • This video is mislabeled. The Expo Line continues with System Integration Testing which is a long series of steps that ultimately lead to Pre-Revenue Testing.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more