The PPC-1 cable has made its landing in Sydney! The cable began on the 19.05.09 from the Tyco Durable approximately 900m from Collaroy Beach, when it was deployed by smaller vessels, and connected via a wire rope to a 30 tonne winch at the beach manhole, some 1500m inshore.
land lubbers!
gbangerau 2 years ago