BP ROV - Transition Spool Install - Success - 5x speed

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
484 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 12, 2010

This is a 5x timelapse of the last few minutes of the install of the Flange Transition Spool on top of the BOP after the old riser flange had been removed by the Overshot Tool (see my last videos). The Transition Spool had a angled pipe at the bottom called a "Mule Shoe" to help wrangle the drill pipe sticking up above the riser flange. It also had cables on the points of its alignment pins to aid in pulling them into the proper location (using the 3" ports that old choke and kill lines went through) down the riser and through the flange).

It didn't seat fully on the first attempt, so they lifted it back up and set it down and got it on the 2nd try.

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more