Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

18 5/8" Casing

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
28,683
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on May 30, 2007

Running 9100' of 18 5/8" casing in the ground in Kuwait

  • likes, 2 dislikes

Link to this comment:

Share to:

Uploader Comments (dkolewaski)

  • thanks

  • this was on land man and the shoe was huge.. you should have seen the shoe for the 40" casing..

see all

All Comments (27)

Sign In or Sign Up now to post a comment!
  • Wow I will never run my Bitchbox about changing elevaters from here on out . Thats some iron. Nice job I wonder if old drill could get his head through the dog house door after that .lol

  • Awesome!

  • In new mexico we run 13 3/8 almost every well and 20" alot too

  • epic!!!!

  • @epistte

    BTW...Your a fuckin retard. Do you think you sound smart goin round and say things are obvious?

  • How would you like to run the V door with 18 and 5/8" coming at ya! ;) Or how about trying to stab that stuff good times!

  • u sound like a knob

  • Excellent!!... I realized that it would be difficult to control RIH the casing and its cementing process. I believed that the Drilling supervisor couldn't slept tight until this work finished.

  • pretty big casing i stabbed 12-5/8 before i thought that was big

  • shit in california and nevada they run 20 in casing @ 94 lb/ft....geothermal wells

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more