Upload

Loading icon Loading...

This video is unavailable.

Victoria Park Lake Reconstruction - Bypass Channel

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like cityofkitchener's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike cityofkitchener's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add cityofkitchener's video to your playlist.

Uploaded on Feb 16, 2012

Melissa, project manager of the Victoria Park Lake project, explains the bypass channel that is being used to divert the water during construction.

Progress continues at the lake with sediment and native materials continuing to be hauled away and a new lake edge being installed.

To get the lowdown on the clean-up, visit http://www.kitchener.ca/victoriaparklake or sign up for our e-newsletter: http://www.kitchener.ca/enews

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to