Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

WorkSafe Awards 2011 Entrant: Tyco Water P/L (Wang Components -- Pipe Coupling Assembly)

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
551 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 4, 2011

Previously pipe couplings were assembled standing at a bench. Parts for assembly were selected from pallets. Assembled products were lifted from the bench to a pallet. Employees often complained of sore backs and shoulders. Risk assessments highlighted a number of manual handling hazards. To reduce risk of injury our Works Engineer designed and constructed an indexing carousel. The carousel has a number of assembly stations. Employees work both standing and seated avoiding static muscle loading. Lifting equipment, conveyer and adjustable height tables have reduced bending, reaching and lifting. The table took 6 months to construct.


Copyright in the material on this website is owned by the WorkSafe Victoria and may only be used for non-commercial personal or educational purposes. You may not modify, transmit or revise the contents of this website without the prior written permission of WorkSafe.

Comments may not be published if they do not add to the discussion, are offensive, repetitious, illegal or meaningless, contain clear errors of fact or are in poor taste.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more