Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

SD40-2's Notching up!

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
9,379
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 26, 2009

The engineer of A407 take these two CN SD40-2s through the notchs. Video taken in Stevens Point Wisconsin in 2007.

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:

Uploader Comments (JR7582)

  • whats with the cab windows?

  • @brandonissocoollike Canadian style safety cab.

  • Not sure what was wrong, if anything. Not long after they pulled out of the yard just fine. You aren't suppose to go from notch 1 to notch 8 in one blow, but what he did should of been fine. Your should move up notchs when the load meter moves up.

see all

All Comments (28)

Sign In or Sign Up now to post a comment!
  • @JR7582 GO CN RAIL !

  • @GordonFreemanD40 Sir, I've run these units in the past. thats only notch 4 now listening to it a second time. thanks.

  • @Tcaauwe2002 that IS notch 8 for 645s. What you're thinking of is the 710, which has a far different notch 8 sound. Just watch a vid with an MP40PH in it. They are almost always in Notch 8 when travelling.

  • @JR7582 oh im from US

  • @7674Princess General statement. Not directed solely at you. Sorry you took it that way!

  • @csx5400 Chillout CraSh Xpert.......It was just a question....My goodness!

  • @7674Princess You read a manual!? I run SD40-2s, SD60Ms, etc on CSX from Detroit to Toledo and vice versa all day everyday and i've never seen a manual. No offense to you but i'm just reading all these postings of people who never stepped foot inside big power or work in any capacity for a railroad and now everybodies an expert on train handling. Put in a job application, do hard labor as a freight conductor, go through the hard as hell engineer school, then talk about train handling.

  • Hey bro, take a look at the lead locomotive as he throttles up. The trailing unit nudges the first unit. The first unit should have been pulling. That suggest that the lead unit shut down.  The trailing unit was trying to pull the train by itself.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more