Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Palmer Township 3rd Alarm National Plastics Fire 7-15-11

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,965
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 15, 2011

Palmer Township,Pa-- Multiple departments working on the 3rd alarm fire at National Plastics Manufacturing Co. at 11 McFadden Road.

Fire departments were alerted shortly before noon today for a reported dumpster fire. Arriving Palmer Township Fire Commissioner found a large plastic pile roughly 50x150 burning out of control and upgraded the assignment to a 1st alarm.

First due ladder from Palmer took the plug and went to work with master streams and the ladder pipe operations the next due engine from Tatamy took the 2nd plug and supplied Nazareth's truck for ladder pipe and master stream operations.

Fire crews went to work interior for extension into the building but had to back out after stacked piles of carboard and plastic containers were unstable. Units had to go to an extensive defensive operations requiring command to upgrade the assignment to a 2nd and eventually 5 alarms.

Crews worked for hours to bring the fire under control using heavy machinery to pull the piles apart. Command had the fire under control by late afternoon.

Units on Scene: 27,28,25,24,22,50,54,53,36,13,14,15,17,18

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • intense :S

  • what caused the fire?

  • Wow first coment but I was there dang it was hot

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more