Plan the tubing installation. Before you install tubing to carry dust and dirt to the power unit, plan your route. Running the tubing beneath the sub-floor whenever possible makes tubing easier to work with and creates the shortest path between the inlet valves and the power unit.
Link to this comment:
All Comments (0)