@brokenshackles101 We dig the holes 4 ft. and put 8 inches of concrete on the bottom...We use a 18 inch auger bit...Some of these holes in this video were dig with a backhoe unit 6 ft. deep and 2 ft. of concrete put in because of the fill we were building on. The poles are 6x6 8 ft. on center and the 2x6 wall grits are 2 ft. on center...Thanks for watching !
What is the depth of the footing concrete? How far apart are the 6x6 poles? One last thing, how far apart are the horizontal boards from each other?
brokenshackles101 1 year ago
@brokenshackles101 We dig the holes 4 ft. and put 8 inches of concrete on the bottom...We use a 18 inch auger bit...Some of these holes in this video were dig with a backhoe unit 6 ft. deep and 2 ft. of concrete put in because of the fill we were building on. The poles are 6x6 8 ft. on center and the 2x6 wall grits are 2 ft. on center...Thanks for watching !
Uwiluz60 1 year ago