Sheet Piling (UK) Ltd were employed by DONG Energy to carry out the installation of 'Free Issue' Arcelor Mittal AZ sheet piles to form 2no 'Strong Points'. The 'Strong Point' were required to provide suitable access points for 2no 1300Te Crawler Cranes which were required for lifting up to 800Te tubular mono-piles.

The works were completed to form wind turbine foundations for the Walney Off Shore Wind Farm Phase 2. In total 42no pairs of Arcelor Mittal AZ25 and 20no pairs of Arcelor Mittal AZ14 sheet piles, in Grade S355GP Steel, were installed to each 'Strong Point' which were each approximately 21m & 19m on plan.

Prior to installing the sheet piles, approximately 6000Te of quarried aggregate stone was back-tipped for the existing dock to provide a suitable piling platform. Once installed, the sheet piles were tied together using an Arcelor Mittal tie rod and waling beam system.

Each 'Strong Point' was then completed by topping up with stone to tie in with existing quay levels together with bollard installation. Upon completion of the Walney Off Shore Wind Farm, the Arcelor Mittal sheet piles are anticipated to be extracted to reinstate the quay to its original condition.

For more information visit: http://www.sheetpilinguk.com

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more