The New harusch Incline Cableway Transport System under construction

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
195 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 30, 2010

In its final completion stage, this is the New- harusch Incline - a personal Incline Cable way manufactured in Squamish BC, connecting a Villa on top with there beach house, traveling over a steep unstable hill side low to the ground, not disturbing the hydrology and not hard on the landscape, comfortable accessing there beach house on the bottom on Lake Michigan. Due to the unstable slope, this transport system, the harusch cable way, is suspended between 2 concrete blocks, with the wagon riding on top of the cable way about 3 ft from the ground, with all the safety as to reduced speed docking and constant save speed E-break system. www.harusch.com

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more