Drywall Installation in Time Lapse

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
5,640
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 17, 2009

I was bored so I recorded the Drywall that was being blocked at the Store where I worked in Time Lapse.

Category:

Education

Tags:

License:

Standard YouTube License

Link to this comment:

Share to:
see all

All Comments (9)

Sign In or Sign Up now to post a comment!
  • Look at that fail framing job too, those studs are no where close to 16" centers.

  • @lastbreath 187,you really know the rules of the game.Nice.

  • Please don't stereotype because of this guys!

    There's still good workers out there,.

    That gap,that gap,,,,,,Props!

  • Keep the drywall off the ground at least a quarter inch. Mold problems will happen when drywall touches concrete. Start with your top sheet and you wont have problems. You should of left your gap at the bottom for the flooring to tuck under.

  • my guess is that the gap will be filled with a strip of board , I don't think they would leave that gap like that but i could be wrong

  • this guy is an idiot dude u had 12' BOARds

  • ya u suck

  • r u kidding yeah that gap wont crack hack job

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more