3S Segment Panel System - from National Liner, L.L.C.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
776 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 16, 2009

Large diameter sewer pipe and culvert rehabilitiation process using translucent pvc panels, that when assembled within the damaged host pipe, form a new pipe. Panel segments are lightweight and can be handed down through a typical manhole opening; therefore no entry or access pits are required. Structural grout is used to fill the annular space between the old pipe and the new 3S pipe. -- The grouting process can be monitored, through the translucent 3S panels,to ensure proper amount and coverage. The new 3S pipe provides years of corrosion free protection

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more