Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Model calibration at the Øresund cable stayed bridge

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,145
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 30, 2009

At the Oresund cable stayed bridge in Sweden the cable stay outriggers where instrumented in order to monitor fatigue development at the outrigger root for design verification. In order to calibrate a local FE model a 5 kN force was applied to the outrigger in order to monitor the resulting strain. The structural monitoring and the FE model showed up to provide almost the same result.
http://www.cowi.com/menu/services/transport/bridges/structuraldynamicsandvibr...

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more