Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

ROV inspection of a 9 ft diameter ocean intake pipe at a power plant.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
678 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 1, 2009

This is an example of a pipe that has not been cleaned regularly. The pipe is 2300 ft long and we calculated that the volume of bio-fowling to be removed to be 3000 cubic feet.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more