Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Visita de estudo Alto Lindoso Barragem

Loading...

Sign in or sign up now!
9,231
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 23, 2009

Visita de estudo à Barragem do Lindoso. A Central subterrânea localizada, em planta, cerca de 70 m a sul do encontro esquerdo da barragem, com pavimento principal a 340 m de profundidade. É equipada com dois grupos geradores, cada um constituído por uma turbina tipo Francis de 317 MWe por um alternador de 350 MVA;
Circuito hidráulico extenso, no qual se insere a Central, constituído por:
- duas galerias e poços em carga independentes, com os comprimentos de 455 e 502 m;
- uma chaminé de equilíbrio, a jusante da Central;
- uma restituição com cerca de 5 070 m de extensão, a qual devolve as águas ao Rio Lima cerca de 900 m a montante da antiga Central de Lindoso;
- Edifício de comandos Subestação de 18/400 kV, com 6 transformadores monofásicos (3 por grupo de gerador). Liga com a Central através de um poço circular, com diâmetro de 6,80 m e a altura de 350 m, no qual de instalam barramentos e cabos e ainda acessos verticais por escada e elevador.
Um conjunto de galerias permite o acesso à Central e às Câmaras de válvulas esféricas e de borboleta, delas se destacando a galeria principal de acesso, com uma extensão de 1 780 m.
A antiga Central de Lindoso foi o primeiro grande centro produtor hidroeléctrico instalado em Portugal (entrada em serviço em 1922), e ainda hoje continua em funcionamento.
Study visit to the Dam Lindoso. The Center located underground, in plant, about 70 m south of the meeting left the dam, with main floor at 340 m depth. It is equipped with two generating sets, each consisting of a Francis type turbine of 317 MWe for an alternator of 350 MVA;
Extensive hydraulic circuit, which includes the Central, comprising:
- Two galleries and independent wells laden with lengths of 455 and 502 m;
- A stack of equilibrium, downstream of the Central;
- A refund of about 5 070 m in length, which returns the water to the Rio Lima about 900 ma amount of the former Central Lindoso;
- Building of the 18/400 kV substation controls, single phase transformers with 6 (3 per group generator). With the Central League by a circular shaft with a diameter of 6.80 mea height of 350 m, in which buses and to install cables and vertical access by elevator and stairs.
A number of galleries allows access to Central and Boards of spherical and butterfly valves, it is highlighting the main gallery of access, with a length of 1 780 m.
The former Central Lindoso center was the first major hydropower producer located in Portugal (entry into service in 1922), and still remains in operation

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • muito legal!!!

  • Também tive oportunidade de visitar esta barragem. Impressionante estrutura sem dúvida.

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more