Segment 2 of 2 - the actual production didn't have a break, but due to YouTube's time restrictions, one had to be added before uploading.
The project was to create a 13 minute live to tape programme, containing:
- Equal time between live and prepared content
- A live interview
- A live performance
- A live blue screen segment
Of the four takes we did on the day, this was our third one. The run was cut short and reset when the wrong video input was sent to program. The problem was the key used to initiate the transition from the intro VT to the studio was still on, and when the next camera shot was called, the VT input was called up, even though the correct camera button was pressed. After some initial confusion, the problem was understood, and we reset for the fourth take.
This was filmed in Deakin University's TV studio, under the eye of Liz Baulch.
Many thanks to Luke Raisbeck for his work in the studio as the technical director.
Link to this comment:
All Comments (0)