Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

ACM237 Major Project "It's Playtime" - Take 1 Segment 2

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
64 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 8, 2010

Segment 2 of 2 - the actual production didn't have a break, but due to YouTube's time restrictions, one had to be added before uploading.

The project was to create a 13 minute live to tape programme, containing:
- Equal time between live and prepared content
- A live interview
- A live performance
- A live blue screen segment

Of the four takes we did on the day, this was our third one. The run was cut short and reset when the wrong video input was sent to program. The problem was the key used to initiate the transition from the intro VT to the studio was still on, and when the next camera shot was called, the VT input was called up, even though the correct camera button was pressed. After some initial confusion, the problem was understood, and we reset for the fourth take.

This was filmed in Deakin University's TV studio, under the eye of Liz Baulch.

Many thanks to Luke Raisbeck for his work in the studio as the technical director.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more