01.06.2010 , Sayano-Shushenskaya Hydro Power Plant

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
4,989
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 1, 2010

June 1, 2010 — completion of the first phase of the shore spillway
Unique in its type, it will afford safer operation of the entire hydroelectric power plant
intake portal
two free-flow tunnels
the exit portal
five-step drop
the discharge canal.


527 m — the minimum opening of the water gate
1,122 m, 10 m, 12 m


198 m 119 m 121 m 121 m 150 m 100 m

Speed — 22 m/s
Speed — 4-5 m/s
100 m

Planned:
Completion of 330.9 thousand cubic meters of tunnels
Removal of 5.38 million cubic meters of soil and rock
Laying 701 thousand cubic meters of concrete
Installation of 1,169 tons of hydro mechanical equipment

September 2011 — the final completion of the water spillway
Total capacity — 4000 m3/s

  • likes, 3 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • Damn!

  • Merci de ces explications.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more