Time lapse construction of our new hotel and spa.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
75,287
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 13, 2008

After two years in the making, all the guilty pleasures of a luxurious, world-class destination are now yours with the opening of Agua Caliente Casino • Resort • Spa, a stunning 16-story resort hotel & casino in greater Palm Springs, California. Among the items used to make what you see here: 5,500 tons of reinforcing steel, 950 tons of structural steel, 35,500 cubic yards of concrete, 4,150,000 pounds / 1,650 square feet of dry wall, 2,000 miles of wire, 21,000 junction boxes, 4,500 electric sockets, 2,200 electrical switches, 4,000 light fixtures, approximately 1,450,000 man hours (700 workers on the job at the peak of building) and much, much more!
www.HotWaterCasino.com

Category:

Entertainment

Tags:

License:

Standard YouTube License

  • likes, 5 dislikes

Link to this comment:

Share to:

Top Comments

  • funny how i was linked to this from a video of a 15 story hotel built in 6 days... and this took 2 years.

  • I saw the FedEx truck almost a dozen times

see all

All Comments (27)

Sign In or Sign Up now to post a comment!
  • This is cool. you don't see buldings like this where I'm from

  • Two years to build it and two days for the bed bugs to find their way in.

    HA HA HA

  • @Rereversed Having just visited China, I was surprised to learn that many new apartment buildings in China had to be demolished , due to builders using sub-standard concrete.

  • @j2xdude Well, not all building are the same. Anyway, a modular building done in a couple of days is really awesome to know about!

  • I swear that was my mom on the corner, I counted she got picked up 147 times...she always say's that she is a busy woman, but damn!

  • @PowerRizer It does, but the resolution of the video doesn't help much, but you can see sometimes the red light slightly pops out.

  • @j2xdude the other hotel was built off site, as in premade cubes and installed on site.

  • vao mentir para casa do caralho the concrete need at least 12 hous to dry on walls and least 5 days to streep on slabs

  • vao mentir para casa do caralho

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more