Paul Huntington's Pennsy 2-10-4
Loading...
2,602
Loading...
Uploader Comments (rwjenkins)
see all
All Comments (7)
-
@paullubliner Glad to hear that. If he'd have done the drivers from scratch, there'd have been no compromises at all! Even down to spoke cross section, my personal pet peeve.
-
beauitful
-
@rwjenkins cool thanks. this locomotive looks like a piece of art!
Loading...
How long did it take you to build? Any hand machining or all CNC?
paullubliner 6 months ago
@paullubliner It was built by Paul Huntington, all of it is good old-fashioned hand machining. Everything is made from scratch except for the drivers (bought as rough castings that required finish machining and assembling on the axles) and the pressure gauge. I believe it took him about a year and a half to build it.
rwjenkins 6 months ago
Coal- or Butane-fired??
steved0689 8 months ago
@steved0689 It's alcohol-fired.
rwjenkins 8 months ago