ITC Transmission defies a Hartland Township local ordinance to construct an above ground electrical power transmission line. A local ordinance states all new electrical transmission lines must be buried. ITC Transmission will soon build a 21-mile route with 100-140 foot poles through a pristine section of Hartland Township.
Link to this comment:
All Comments (0)