"Bring it downtown to swap out crews. Got fuel readings, over?" asked Gavin Yardmaster before Engineer Grindy brought a 7.2 HPT Z9 into Minot for a crew change. Mark, who is one of the best to work with up here, eases the 4 Dash 9's into dynamics and sets a smidge of air, and hands over the 4400 foot train to a Dilworth bound crew.
awesome catch :)
trainOholic 1 month ago