Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Cleveland Load Training

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
11,621
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 16, 2009

This is a training session working with the Cleveland Load High-Rise Hotel Pack

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • The youtube site won't allow it... perhaps someday that might change... hope you have a safe week.

  • @hftfire why couldnt you just put the website link instead of spelling it out?

  • The key to this load is having the coils of hose 'coiled' to their MINIMUM INSIDE CRITICAL DIAMETER to accommodate 100' coil bundles. It is important they are not too small... the coils need to be big enough in diameter... as my patented hose roller/coiler does. Go to 3 w's period hftfire period com I patented this method and the apparatus (roller) to coil and roll fire hose accordingly in 2001. One fire fighter can load any preconnect in this configuration with the assistance of this device.

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more