Scaffold Installation
Loading...
13,153
Loading...
Uploader Comments (BrutisBB)
see all
All Comments (4)
-
Amazing, everything in only 3 minutes :) - what the actual time do you think it takes to put up a 3 level 16 foot tower?
Also, the side pieces that prevent the scaffolding from tipping over, what do you call them - do they come with regular package? which version did you buy? (scaffoldmart has regular, deluxe and super deluxe rolling and non rolling) etc..
Thanks for posting this video. It definitely helps.
Loading...
I recall it took about 20 minutes - much faster with two people. As I recall the stabilizers are called outriggers/stablizers. Yes, the outriggers came with the package - required for taller set-up. The stabilizers make the tower much more comfortable to be on - less wobbling. I bought the rolling tower that reached 25 feet so I could reach the 35' peak (with a short ladder). The rolling allows me to roll around inside the house.
BrutisBB 1 year ago
what's the foot print? I just built 24' x 49' 2 story Sip over ICF foundation. The ICF was much faster than the SIPs. ICF crew was 2-3x bigger than sip crew though. My roof is 12 inch panels, though I didn't use the I joists like you did between the sips.
stronty 2 years ago
Footprint is 26x26 with a roof peak of 34 feet above ground. Bottm floor is garage, bedroom and bath. Second level is living area. Loft and bathroom above. I joists are to carry 100psf snow load.
BrutisBB 2 years ago