Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Building Improvements Mark First Month of Fall

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
809 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 1, 2009

When students returned to Westmont for the first day of classes, Aug. 31, they encountered many changes and improvements to the Montecito campus. One of the first noticeable enhancements is a new lower Cold Spring entrance, featuring a stone veneer wall. Many larger stones at the entrance have been quarried from other construction areas on campus. Workers have planted about a dozen native oak trees near a new irrigation basin inside the entrance.

The mens and womens soccer team play their home games this season at Westmonts Lovik Field, Santa Barbara City Colleges La Playa Stadium or UC Santa Barbaras Harder Stadium while a new track and field/soccer complex is being built. Soil from the basements of a new art center and science building has been used to raise the level of the new track and soccer complex. Heavy machinery has been carving tiered, four-foot wide seating into the hillside above the track. Workers are building a restroom facility thatll include track storage and a scorers area. The new baseball field has been shifted slightly to accommodate the observatory and new campus road. Both the baseball field and the track will be ready for action by the start of the spring semester.

Crews were able to put the finishing touches on the three Clark Hall buildings that were destroyed in the Tea Fire. Students there are enjoying new restroom facilities, utilities and redesigned interior spaces. About 20 resident assistants helped long-time Clark Hall Resident Director Mark McCormick into his familys new cottage.

Its a double-edged sword, McCormick says. Its bittersweet that our old house is gone and all the memories we had there, but its also nice to be out of temporary housing. We can now make this a home.

The cottage, Clark F, has been rebuilt to better fit the needs of McCormick and the students who visit his home.

A crew from DFM Engineering in Colorado will travel to Westmont Sept. 8 to begin the delicate process of installing the Keck Telescope into the yet-to-be named observatory. A large crane will be brought onto campus to lower the powerful telescope under the metallic dome. Michael Sommermann, physics professor, and students will calibrate the high-tech instrument for about two weeks. Construction crews have nearly finished the observatory, which includes a beautifully landscaped area outside the downstairs classroom.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more