Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

SETTING UP A TOTAL STATION

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
59,717
Google+
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Sep 23, 2009

No description available.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 5 dislikes

Link to this comment:

Share to:

Uploader Comments (gmasurveyor)

  • Rookie Mistake: Audio and video are not in sync, its very frustrating to watch. 1 star for me

  • Thanks for the input. I don't know why that is??

    let me ask, what brought you to find this video? were you looking for surveying video? Are you in a college class?

Top Comments

  • You made my heart skip a beat when you let go of your GTS-300 (one of my favorites)!

    As an instrument technician, and having set up and taken down over 20,000 instruments without dropping one, I'm glad you know the "always have one hand on the instrument until it is locked down" rule!

    But I wouldn't have dared to test it!

    Cheers, and thanks for posting.

    Service Supervisor,

    Clausen Instrument Co.

    800-872-5362

see all

All Comments (33)

Sign In or Sign Up now to post a comment!
  • Great video but if they show readings on screen it would be great........

    ..

  • thanx that was very helpful ..

  • can u fix the audio plz

  • i wanna make hilper so you teache me

  • now need foresighting and backsighting

  • why i study this 

  • Fuck My Life. I hate my course.

  • Im an engineer & Im so used to using the Leica TCR805 Total Station with the laser. My job have a very old total station and I can't remember the name of it but it does have an optical plummet. It seem like I downgraded since college but Im trying to get them to get some new equipment. I hate using optical plummets total stations. It's so much faster using the Leica's & TDS data collectors. I was knocking out culvert surveys in 1 day & by the way we had 1.5 minutes to set up a total station. LOL

  • 10 minutes to set a station!!

    YOU ARE FIRED!

  • Thx for posting this!

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more