Terex O&K RH200 - RH340 excavator loading Komatsu 730E and 830E rigid frame trucks
Uploader Comments (mineservices)
Top Comments
-
So when does it transform?
-
They can't Transform until Mixmaster shows up. Megatron's orders.
All Comments (41)
-
there is something very wrong about this technique
-
its an accident waiting to happen,you should never double bench ,higher than the cab on digger ,to fix this lift the height of the bench up to at least the height of the duck tail ,or the back of truck tray ,thus lifting the bench height,and lessing the chance of excavator getting buried ,also create a big hole in front of digger ,so if any bulk material falls dowm,it will land in the hole rather than land on you,Satety first ,production will follow
-
wagons queing up and keepin that baby going all night. sweet.
-
where is this filmed?
-
@Gavin84w The vids are by moofussa & skamootie
-
@FUCKINROCKIT No you always go forward to the end of your cut and then go back the full distance on the same bench. When you do it as he is in the vid and back the trucks in on angle, roughly 45 degrees you establish a line of site from cab to cab with the truck and digger which adds an element of safety to the situation. Check Komatsu PC5500 vids on youtube, that is where i used to work and it shows it much better than this vid as you are in the cab of the PC5500 for the ride.
-
@FUCKINROCKIT Basically he advances forward knocking the material down and into a hole in front of him and then goes back in pretty much the same tracks he went forward in removeing the bench he was on and then allowing the trucks to move over
-
Muito manero !!!
-
i wish i were the operator of this monsterexcavator
-
rofl!
The machine which is an RH200 has an RH340 boom, stick and bucket (bucket reduced to 37 cubic yards) as well as the RH340B hydraulics and engines (QSK45)