Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

LG Surfaces Bar Top W-Hotel New York City

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
6,310
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 27, 2010

Some shop footage of a Bar top for the W-Hotel in New York City. It's one of four units for the Hotel.

Material used is LG Surfaces Black Spectrum

All aspects of Solid Surface fabrication had to be utilized in the Fabrication process. From Extreme engineering,CNC technologies ,Compound 3d thermoforming to advanced Sanding .

Sanding is underrated most of the time. But at Sterling Surfaces we feel it's one of the most critical parts of the job.

I'll post completed pictures on our flickr site www.flickr.com/photos/sterlingsurfaces/ so stay tuned !

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (sterlingsurfaces)

  • Very,,,very impressive. I make a living at counter top cutting and fabrication so I know how much work would have gone into this. It would definitely be a challenge I'd be willing to take on. How many hours went into this particular piece?

    Excellent job by the way. =0]

  • thanks for your kind words it took weeks to build

see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • My god thats a lot of sanding lol

  • All we need now is Tennessee Ernie Ford to sing quaint songs for the patrons. Remember Tennessee Ernie Ford, that song about 16 tons?

  • That is one of a kind I like alott

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more